Microcement SOLID COLOR CimentArt
Before starting
Check the surface where the product would be apply and make sure the surface is:
- Straight.
- Stable, motionless.
- Dry and without humidity.
- Clean.
- Free of dust, grease, etc.
Step-by-step application
Place the protective tape where necessary
For the application over completely smooth walls, do only steps 2, 4, 5, 6 and 7.
In the case of application on floors and walls in bad conditions or with tile joints do all the steps.
1. Extend the Fiberglass mesh CimentArt over the Surface
2. Apply a layer of CIMENTART Primer with a roller over the fiberglass mesh, exerting
some pressure to create adherence on the surface.
3. Microcement base CimentArt
- Shake energetically the Mixture Resin CimentArt.
- Mixture for floors: 2,5 parts of Microcement powder per 1 part of Mixture Resin CimentArt.
- Mixture for walls: 3 parts of Microcement powder per 1 part de Mixture Resin CimentArt.
- The coverage is of 1kg / m2 for a layer of 1 mm, it is necessary to apply 2 layers. 2kg
of Microcement Base is necessary for a surface of 1 m2.
- Mix well with an electric mixer to achieve a smooth mixture.
First layer application of Microcement Base:
- With the steel trowel, using an angle of 45° giving a thickness of 1 mm maximum (the thickness is given by the grain of the mixture and by the pressure used during the application).
- Complete the first application making it as homogeneous and without irregularities as possible.
Allow the Microcement Base to dry completely:
- The drying time depends on the humidity, temperature, ventilation, etc.
- Remove with a spatula or with the sandpaper grit 40 any remaining irregularities of the first layer of Microcement Base.
- Remove the sanding dust with a vacuum cleaner. Use damp cloth to clean the surface.
Place the protective tape where necessary.
Apply the second Microcement Base layer:
- With the steel trowel, using an angle of 45° giving a thickness of 1 mm maximum (the thickness is given by the grain of the mixture and by the pressure used during the application).
- Complete the second application making it as homogeneous and without irregularities as possible.
- Tip: the first layer as well as the second can be spray with water and slightly pass the steel trowel to correct the irregularities.
Remove the protective tape before the Microcement hardens and allow the second layer Microcement Base.
- The drying time depends on the humidity, temperature, ventilation, etc.
4. Fine Microcement CimentArt
- Mix 750 grams of Fine Microcement with half a liter of Mixture Resin CimentArt.
- The coverage of this Microcement is of approximately 250 grams / m2 applying the product with a layer of 0,1 mm. it’s necessary to apply 2 layer and between 400 to 500 grams are necessary for a surface of 1m2.
- Mix well with the electric mixer until a smooth mixture is achieve. Let rest for 5 to 10 min on winter (while on summer it is not necessary).
- Do not mix a big ammount of this product, as it hardens fast tan the Microcement Base.
Application of the first layer of Fine Microcement:
- Use our special trowel for Fine Microcement and make the application with short and circular movements, using an angle of 45° giving a thickness of 0,1 mm maximum (the thickness is given by the grain of the mixture and by the pressure used during the application).
- Complete the first application making it as homogeneous and without irregularities as possible.
- Remove the protective tape. Allow the layer of Fine Microcement to dry.
- The drying time depends on the humidity, temperature, ventilation, etc.
Place the protective tape where necessary.
Complete the second application making it as homogeneous and without irregularities as possible.
- With the trowel for Fine Microcement and make the application with short and circular movements, using an angle of 45° giving a thickness of 0,1 mm maximum (the thickness is given by the grain of the mixture and by the pressure used during the application).
- Complete the second application making it as homogeneous and without irregularities as possible.
- Remove the protective tape and allow the second layer of Fine Microcement to dry.
- The drying time depends on the humidity, temperature, ventilation, etc.
- Tip: For the joints not to be visible, the last layer of Fine Microcement CimentArt is applied in a continuous fashion until the completion.
5. SOLID COLOR CimentArt Sealer
Once the application of Fine Microcement is completed the application of SOLID COLOR CimentArt SEALER begins.
- Place the protective tape where necessary.
Clean the roller and the painting pan with water.
6. CimentArt Sealer
- Place the protective tape where necessary.
Pour into the painting pan the CimentArt Sealer and apply a uniform layer, with a short-haired or microfiber roller and allow to dry completely.
- The drying time depends on the humidity, temperature, ventilation, etc. it often dries really fast.
- The coverage CIMENTART sealer is of 100 gr /m2. To make a surface of 10 m2, 1 kg would be necessary.
Clean the roller and the painting pan.
7. Bi-Componente polyurethane varnish CimentArt
For the complete finishing use Bi- component, varnish CimentArt.
Preparation:
- Mix 5 parts of the Cimentart Base Aqua Varnish Polyurethane component A with 1 part of the component B.
- To make 1 kg of varnish with the 2 components 840 gr of component A and 160 gr of component B are necessary.
- The approximate coverage is of 50 gr/ 1m2, applying a thin layer of 0,1mm. Is always necessary to apply two layers. To complete a surface of 10 m2 with two layers approximately 1 kg of the mixture is necessary.
For any technical guidance write to: info@cimentartusa.com